Our Services
We are here to provide you with the highest quality manufacturing of Aluminium Curtain wall, windows and doors. Using Senior Architectural Systems and Technal‘s suite of systems, we offer high-performing products for any commercial or residential application.
If you have fire-rated requirements on your project, we supply & install Aluprof MB-78EI 30/60 Windows & Doorsets through a trusted partner.
An option on all packages is Installation - we will provide a full ‘Turn-Key’ solution including a whole of extras; Teleflex/Actuation, Automatic Door Operators, Glass Canopies, Silicone & Membrane seals, Removal & cart-away of existing frames.
Aside from manufacturing, we can also provide consultancy services - assisting with the design, procurement & scheduling required for your project(s).
Windows
Unglazed
Senior Architectural Systems - Ali VU, 600 series, PURe
Technal - Soeal Next 75, FZ75
Delivered palletised, secured with banding straps and protected by low-tac tape and shrink wrap.
minimum LEAD TIME - 5 WEEKS
You can supply material to us, or we can supply & manufacture it.
Glazed
In addition to manufacturing, we can provide off-site glazing solutions, glazing windows for MMC and modular schemes.
Delivered stillaged, secured with banding.
minimum LEAD TIME - 7 WEEKS
You can supply material to us, or we can supply & manufacture it.
Curtain walling & Doors
Curtain wall
Senior Architectural Systems - SF52 Zone & Mullion Drained
Technal - Tental 50 (T/T) Fully Capped Tental 60 (T/T) Fully Capped
Including all associated components: Pressure Plates, Caps, Pocket Filler, Perimeter profiles, brackets, cills
Delivered palletised, secured with banding straps and protected by low-tac tape and shrink wrap.
minimum LEAD TIME - 5 WEEKS
You can supply material to us, or we can supply & manufacture it.
Doors
Senior Architectural Systems - Ali VU, 501, 600, SP150, PURe
Technal - STii Commercial Door, Soleal Next 75, Titane Next 75, Confort Smartline Sliding Door
Delivered palletised, secured with banding straps and protected by low-tac tape and shrink wrap.
minimum LEAD TIME - 5 WEEKS
You can supply material to us, or we can supply & manufacture it.
Consultancy
Design | Procurement | Scheduling | Management
We can assist with your design, procurement and scheduling requirements, providing the whole service to ensure a high standard is felt by your client.
We’re here to help you - give us the problem, we’ll try and give you the solution!
minimum LEAD TIME - 2 WEEKS